Massachusetts · General Contractors

General liability and completed operations for Massachusetts GCs

Two buckets: operations, and completed operations

Liability is the policy your owners, lenders, and biggest losses all run through. A commercial general liability policy divides injury and damage into two buckets. Premises and operations covers damage while work is underway: a fire started during construction, a pedestrian hurt by site conditions, a pipe burst during rough-in that ruins the floor below. Products-completed operations covers damage after the work is finished, inspected, and handed over: the supply line that lets go in the first winter, the deck that fails at a family party, the water intrusion that rots a wall assembly over two years.

For a GC, both buckets carry real money, but completed operations carries the longer risk, because it includes your subcontractors' finished work too. When an owner sues over a failed system, they sue the name on the contract, which is yours. Your defense is your liability policy in front and your subs' additional insured endorsements behind it, which is why the certificate system is a liability strategy, not clerical work.

The Massachusetts tail: six years of repose

Under MGL c.260 §2B, Massachusetts' statute of repose for improvements to real property generally bars tort actions arising from a deficiency or negligence in the design, planning, construction, or supervision of an improvement six years after substantial completion and the owner's taking possession for occupancy, subject to the statute's terms. Six years is a long time to stand behind a project. It is the practical reason owners require completed operations additional insured coverage that survives the job, and the reason a GC should not let liability coverage lapse or downgrade in a slow year: the claims from your busiest years are still out there.

Indemnity has limits in Massachusetts

Construction contracts routinely try to push one party's negligence onto another. MGL c.149 §29C generally voids subcontract provisions that require a subcontractor to indemnify another party for injury or damage not caused by the subcontractor or its people. Read the indemnity clause in every subcontract and prime contract alongside the insurance exhibit: the insurance you are asked to carry and the indemnity you are asked to give are two halves of the same risk transfer, and §29C sets the outer boundary of the second half.

The exclusions and gaps that surprise GCs

Damage to your own work

Liability covers damage your work causes to other property and other people. The cost to tear out and redo the defective work itself is generally on you. Owners hear "we're insured" and assume otherwise; say so plainly in writing before the job.

Care, custody, and control

Standard liability forms exclude property in your care, custody, or control: the customer's property you have taken charge of while you work. The classic GC version is a renovation: the owner's existing structure, finishes, and contents in the rooms your crew controls. That gap is managed deliberately, with builders risk coordination and, where needed, specific endorsements, not discovered after a fire in an occupied home.

Damage to your product and impaired property

Related exclusions limit coverage where the loss is the diminished value or loss of use of the work itself rather than damage beyond it.

Subcontractor conditions

Some GC liability policies carry conditions or exclusions tied to subs: for example, coverage positions that depend on your subs carrying their own insurance and naming you as additional insured. Fail the paperwork condition and you may have weakened your own policy.

Professional services

If you stamp, design, or value-engineer beyond build-only work, design liability is a different policy. Do not assume the GL follows you there.

Choosing limits and aggregates

  • $1M per occurrence / $2M aggregate is the working floor, because contracts require it, not because the state sets it.
  • Watch the completed operations aggregate separately. It is its own limit bucket. A serious loss on a finished job draws on it, and the next finished job's claim draws on what is left that year.
  • Ask for a per-project aggregate if you run multiple jobs: the general aggregate then applies separately to each project, so one bad job does not erode the limits another owner is relying on.
  • Price the umbrella before the contract forces it. Municipal, condo, institutional, and lender-financed work commonly requires excess limits. It is usually the cheapest added million available and cannot be bound after a loss.

How each line is priced is in the cost section.

Builders risk in Massachusetts: who buys it, what it covers, where it ends

Builders risk is the least understood policy on a construction job, mostly because three parties assume one of the others bought it. Here it is in the order the questions should be asked: whose job it is, what is actually covered, how renovations break the standard answer, and what happens at completion.

Who buys it is a contract decision

Builders risk insures the project under construction as property: the structure being built or renovated, building materials on site, and typically materials in transit or stored off site when endorsed. The construction contract assigns the duty to buy it. On residential work the GC commonly carries it; on larger commercial work the owner frequently does, sometimes under an owner-controlled program. Lenders usually require it either way and want to be named for their interest.

What matters is not who pays the premium but who is named. The owner has money in the project, you have work and materials in it, and the lender has a loan against it. A policy that names only one of you can leave the others arguing from outside the policy after a fire. Standard practice is a policy that names the owner and the GC, and covers subs for their interest in the work, with waivers of subrogation among the project parties so the carrier that pays a fire loss does not sue the party whose space heater started it. Get the contract language and the policy to say the same thing before mobilization.

What it covers, and what it does not

Covered perils typically include fire, lightning, windstorm, hail, theft, and vandalism to the work and covered materials, subject to the form and its exclusions.

Not covered: the cost of fixing defective work itself, wear and gradual deterioration, employee theft on many forms without endorsement, and earthquake or flood unless added. Massachusetts projects near the coast should have the wind and flood conversation explicitly, not by assumption.

Soft costs and delay: a serious loss mid-project costs more than lumber. Loan interest, permits, architect fees, and lost rental or sales income during the rebuild are "soft costs," covered only when the policy includes them. On financed projects this endorsement is where the real protection sits.

Theft is a paperwork claim. Materials stolen from a site get paid against invoices, delivery records, and the project budget. Keep delivery documentation in the job file as a habit.

The renovation gap

New construction is simple: one structure, one policy, one value. Renovation is where builders risk goes wrong. A standard course-of-construction policy is written around the value of the new work. The existing building it attaches to is usually the owner's property policy's problem, and many owner policies restrict or exclude losses once renovation passes a certain scale, or when the building is vacant.

Before a major renovation or addition starts, get both answers in writing: the owner's carrier confirms the existing structure stays covered during construction, and the builders risk policy states its limit as the completed value of the new work, or the full project value if the contract makes the GC responsible for the whole. An addition burned at framing stage is the wrong time to discover the two policies each assumed the other was primary.

Value, term, and the handoff

  • Insure to completed value. The limit should reflect the full completed value of the covered work, not the amount spent so far. Underinsuring invites coinsurance penalties on a partial loss.
  • Match the term to the real schedule. Policies are written for a set construction period. Extensions are easy before expiry and awkward after. Winter in Massachusetts stretches schedules; buy the time up front.
  • Plan the ending. Coverage typically ends at completion, acceptance, or occupancy, whichever the form specifies. The owner's permanent property policy must be bound to start as builders risk stops, with no weekend gap between them.
  • Report changes. A change order that adds a floor, a garage, or a major system changes the completed value. Tell your agent when the project grows, not at the final walkthrough.
A sub's work failed after closing and the owner is suing me. Whose policy responds?

Yours first, as the contractor in privity with the owner: your completed operations coverage defends you. Behind it, if you collected what the certificate guide describes, the sub's liability policy should also defend and cover you as an additional insured for claims arising out of the sub's work, and the sub's indemnity obligations in the subcontract apply. This sequence is exactly why additional insured status for completed operations, obtained before the job, is worth more than any argument made after one.

Does liability insurance pay to fix my own bad work?

Generally no. Liability insurance responds to bodily injury and to damage your work causes to other property. The cost of repairing or replacing the defective work itself is a business cost the policy is not designed to carry. The boundary gets litigated on real claims, which is one more reason to document scope, inspections, and change orders as you go.

The owner says their homeowners policy covers the addition we're building. Is that enough?

Usually not, and sometimes it is the opposite of enough. Homeowners policies are written for a finished, occupied home, and many limit or exclude construction exposures, theft of building materials, and vacant or partially completed structures. Builders risk exists precisely for the construction period. If an owner insists their policy responds, get that confirmation from their carrier in writing and still settle, in the contract, who carries the course-of-construction risk.

Is builders risk the same as my liability policy?

No. They insure different things. Builders risk is property insurance on the project itself. Liability insurance covers injury and damage you cause to other people and their property. A fire that destroys the framing is a builders risk claim; a fire your work starts that damages the neighbor's house is a liability claim; a real jobsite fire can be both at once.

Get a quote from Segreve & Hall

Three ways in, all reaching the same agency in Andover. Bring your payroll split the way you work (field carpentry, supervision, clerical), your subcontractor costs, your current declarations and mod worksheet if you have them, and any insurance exhibit you are being asked to meet. No coverage can be bound by voicemail, email, or a form submission alone; binding requires a conversation and confirmation, which is how it should work.